You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Air di Kalibata Timur Mulai Dibangun

Water Channel Starts to Be Built on Jl. Kalibata Timur IV

Our target is to complete this channel in two weeks

New water channel starts to be built on Jalan Kalibata Timur IV, RT 10/08, Kalibata Urban Village, Pancoran, South Jakarta.

Kalibata Urban Village Head, Denny Isnandar mentioned, its building cost is Rp 100 million with support from one of BUMNs, PT. Rekayasa Industri's Corporate Social Responsibility (CSR).

20 Joint Personnel Deployed to Handle Inundation on Jl. Raya Fatmawati

"This channel will have 870 meters length. U-ditch will be also installed in the size 30x40 centimeters," he informed, Monday (12/17).

It is done, because it is located in basin area, which is prone to inundation when the rain falls.

"Our target is to complete this channel in two weeks. We hope it can make Jalan Kalibata Timur IV becomes free from inundation," he said.

During construction, Jalan Kalibata Timur IV at RT 02 and RT 08, RW 10, is opened and closed in situational way.

"We will divert the traffic flows as needed," he added.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1297 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1128 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye292 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing